Construction Nodes & Quality Control
Our construction process standard, published node by node as readable text.
Node index (14 nodes)
The index below follows our printed construction standard. For each node we record the work sequence, ' 'quality control points, common defects prevented, and the acceptance criteria applied.
| 01 · Site survey & setting out | Dimension verification, datums, tolerance baseline |
|---|---|
| 02 · Light-gauge steel framing | Layout, spacing, bracing, embed coordination |
| 03 · MEP rough-in coordination | Route conflict resolution, embedded boxes, pressure tests |
| 04 · Waterproofing (wet areas) | Substrate prep, membrane, flood test protocol |
| 05 · Backing board & substrates | Board type selection, joint treatment, flatness control |
| 06 · Drywall & plastering | Level 4/5 finishing, corner beads, crack prevention |
| 07 · Tile & stone installation | Adhesive selection, lippage control, movement joints |
| 08 · Flooring | Subfloor moisture, acoustic underlay, expansion control |
| 09 · Millwork & casework installation | Shop drawing flow, scribe and alignment, hardware adjustment |
| 10 · Doors & ironmongery | Frame installation, fire rating compliance, closer setting |
| 11 · Ceilings | Suspension system, access panels, perimeter detail |
| 12 · Painting & final finishing | Surface prep sequence, colour batching, defect logging |
| 13 · FF&E installation | Receiving inspection, fixing standards, damage prevention |
| 14 · Punch-out & handover | Snag list workflow, NCR closure, handover documentation |
Quality control system
- Three-stage inspection: self-check → team cross-check → company QC acceptance, recorded at every node.
- Concealed works acceptance: written acceptance before covering; photographic record retained per unit.
- Non-conformance report (NCR): defect logged → root cause → rectification → re-inspection → closure sign-off.
- Sample-first rule: every finish material approved by mock-up sample before bulk installation.
Standard record templates (inspection sheets, concealed works acceptance forms, NCR forms) can be provided ' 'as redacted samples on request — so your team can see the actual paperwork, not only the description.
Scope note. All projects in this archive were delivered in China. The company's first United States project (No. 21-21S, 500 townhouses, Pioneer Town, California) is in preconstruction. Founded in 2005 · 20 years of delivery record · Leadership experience since 1997.